Our projects

Industrial construction

"SARY ARKA" MINING COMPANY

• Construction of a hydrometallurgical plant for nickel sulfate production
• Process flow design
• Equipment selection
• Survey task issuance
• Concept design
• BIM digital design
• Working design
• Environmental impact assessment
• Cost estimation
• State expert review
• Construction permit

Facility classification: Hydrometallurgical plant for nickel sulfate production
Duration: 9 months
Year: 2024–2025

Industrial construction

LLP "RESOURCES CAPITAL GROUP"

• Feasibility study (FS) development
• Financial-economic model, CAPEX/OPEX assessment and efficiency evaluation
• Mining, geological and hydrogeological sections
• Process section (extraction and ore processing flow diagrams)
• Master plan, transport infrastructure and utilities
• Automation, instrumentation and control systems
• Environmental assessment and protection measures
• Construction organization, scheduling and risk analysis

Facility classification: Tungsten ore beneficiation and metallurgy
Duration: 12 months
Year: 2024–2025

Industrial construction

"AK SU KMG"

• Construction of a new desalination plant on the coast, Zhanaozen
• Survey task issuance
• Concept design
• Structural calculations
• BIM digital design
• Working design
• Cost estimation
• State expert review
• Construction permit

Facility classification: Desalination plant on the Caspian Sea shore
Duration: 10 months
Year: 2023–2024

Industrial construction

JSC "MB Project Partners"

• Construction of a fiber cement plant in Almaty
• Survey task issuance
• Concept design
• Structural calculations
• BIM digital design
• Working design
• Cost estimation
• State expert review
• Construction permit

Facility classification: Fiber cement plant
Duration: 4 months
Year: 2023

Industrial construction

LLP "CARAVAN RESOURCES GROUP"

• Construction of the Almaly-2 mining and processing complex using heap leaching of secondary ores with a capacity of up to 30,000 tonnes of cathode copper per year in Shet district, Karaganda region
• Process flow modernization
• Detailed BIM design
• Facility and equipment layout
• 3D drawing development
• State expert review with positive conclusion
• Cost estimation

Facility classification: Heap leaching of secondary ores for cathode copper production
Duration: 6 months
Year: 2023–2024

Industrial construction

LLP "RIDDER-POLYMETALL"

• Feasibility study (FS) development
• Project: "Construction of an ore processing plant for polymetallic ore at the Strezhanskoe deposit"
• Feasibility study and project investment analysis
• DCF model for the construction project
• Financial-economic enterprise model, CAPEX & OPEX calculation
• Concept design development
• Preliminary 3D master plan layout at the Strezhanskoe deposit

Facility classification: